Bambrick, B (1994) Construction of an Island. Journal of Construction Engineering and Management, 120(01), 223–7.

Gordon, C M (1994) Choosing Appropriate Construction Contracting Method. Journal of Construction Engineering and Management, 120(01), 196–210.

Grimm, C T (1994) Void Mortar Joints: Bane of Brick Masonry. Journal of Construction Engineering and Management, 120(01), 152–61.

Halligan, D W, Demsetz, L A, Brown, J D and Pace, C B (1994) Action‐Response Model and Loss of Productivity in Construction. Journal of Construction Engineering and Management, 120(01), 47–64.

Ledbetter, W B (1994) Quality Performance on Successful Project. Journal of Construction Engineering and Management, 120(01), 34–46.

Oloufa, A A, Eltahan, A A and Papacostas, C S (1994) Integrated GIS for Construction Site Investigation. Journal of Construction Engineering and Management, 120(01), 211–22.

Riad, N I, Arditi, D and Mohammadi, J (1994) Integrated System for Managing Owner‐Directed Project Acceleration. Journal of Construction Engineering and Management, 120(01), 77–95.

  • Type: Journal Article
  • Keywords: Expert systems; Integrated systems; Project management; Acceleration; Scheduling; Claims;
  • ISBN/ISSN: 0733-9364
  • URL: https://doi.org/10.1061/(ASCE)0733-9364(1994)120:1(77)
  • Abstract:
    An integrated computerized system is described that can be used as a dispute‐resolution tool for managing owner‐directed acceleration. It can also be used as an aid for helping owners and contractors foresee the implications of accelerating a project in terms of cost and liabilities involved. The system is composed of an analysis module written in LISP as its backbone, and a knowledge base limited to related aspects in major contract forms. After obtaining the initial information from the user, the system triggers the analysis module. The analysis module generates several schedules to perform time‐impact analysis. Then, the system uses the knowledge base to assign liabilities to the parties for past events, including delayed, accelerated, added, and canceled (DAAC) activities that were not foreseen in the original schedule. It does this by means of a set of if‐then rules and certainty indices based on the responses obtained from the user. The system then incorporates this information chronologically into a compression analysis carried out again by the analysis module. The system can make a human mediator's job more effective and economical, and can also considerably reduce the occurrence of acceleration‐related disputes.

Russell, A D and Fayek, A (1994) Automated Corrective Action Selection Assistant. Journal of Construction Engineering and Management, 120(01), 11–33.

Russell, J S, Gugel, J G and Radtke, M W (1994) Comparative Analysis of Three Constructability Approaches. Journal of Construction Engineering and Management, 120(01), 180–95.

Rwelamila, P D (1994) Group Dynamics and Construction Project Manager. Journal of Construction Engineering and Management, 120(01), 3–10.

Tanwani, R and Iseley, D T (1994) Tracking and Steering Systems in Trenchless Construction. Journal of Construction Engineering and Management, 120(01), 65–76.

Teicholz, P and Fischer, M (1994) Strategy for Computer Integrated Construction Technology. Journal of Construction Engineering and Management, 120(01), 117–31.

Thabet, W Y and Beliveau, Y J (1994) Modeling Work Space to Schedule Repetitive Floors in Multistory Buildings. Journal of Construction Engineering and Management, 120(01), 96–116.

Thomas, H R and Sakarcan, A S (1994) Forecasting Labor Productivity Using Factor Model. Journal of Construction Engineering and Management, 120(01), 228–39.

Warszawski, A and Rosenfeld, Y (1994) Robot for Interior‐Finishing Works in Building: Feasibility Analysis. Journal of Construction Engineering and Management, 120(01), 132–51.

Wu, R W and Hadipriono, F C (1994) Fuzzy Modus Ponens Deduction Technique for Construction Scheduling. Journal of Construction Engineering and Management, 120(01), 162–79.